Free template

Pre-task plan template

A blank pre-task plan to print and fill in before the work starts: the job, the rules that apply, hazards and controls with the risk that remains, PPE, training, permits, emergency details and a crew sign-in. US Letter, 2 pages, free, no sign-up.

PDF, US Letter, 2 pages. The example is in English and Spanish. Blank template in Spanish

Or start from your job details: the builder drafts the plan, and you review and edit it before the crew signs. See the builder

Page 1 of the FieldSafetyTalk pre-task plan template: fields for project, date, work location, crew, trade and who prepared it, boxes for governing standards and work scope, a hazards and control measures table with a residual risk column, and a PPE table

What's on the template

The sections follow a plan from our builder, in the same order, so the paper form and the software match. The paper form adds an emergency box.

Job details
Project, date, start time, work location, crew or work area, trade, and who prepared the plan.
Work scope
What the crew is doing, where, with what equipment, and anything different about today.
Governing standards
The rules that apply to this task, such as 29 CFR 1926 Subpart M, a state plan or EM 385-1-1.
Hazards and control measures
Each hazard with its control and the residual risk: Low, Medium or High, the risk that remains after the control.
Personal protective equipment
Each item, the specification or standard it has to meet, and why it's required.
Training and work permits
What the crew must hold before starting, and the permits the task needs: hot work, confined space, excavation, energized work, critical lift.
Emergency
Nearest hospital or clinic, who to call, the muster point and the rescue plan.
Pre-shift action items
What has to happen before work starts, who is responsible, and a box to tick when it's done.
Crew sign-in and approval
16 rows for names, company and signatures, and the competent person's name, title, date and signature.

How to fill it out

  1. Describe the task

    Write what the crew is doing and where, and which rules apply: federal OSHA, a state plan or EM 385-1-1.

  2. List the hazards

    For each one, write the control and the risk that remains after it. If you can't confirm something yet, write it as an item to confirm before work rather than guessing.

  3. Add PPE, training and permits

    Name the specification or standard for each PPE item, and tick every permit the task needs.

  4. Review and approve

    The competent person reads the plan, corrects it, and signs it with their name, title and the date.

  5. Brief the crew

    Walk the crew through it before work starts, collect every signature, and keep the plan with the day's records.

Pre-task plan, JHA or AHA?

They describe the same discipline. A Job Hazard Analysis (OSHA's term) and an Activity Hazard Analysis (USACE, EM 385-1-1) break work into steps, hazards and controls. A pre-task plan is that analysis for the task in front of you today, with the crew's sign-off attached.

Browse the AHA / JHA library

Or let the builder draft it

Describe the task and answer a few questions. You get a draft plan built from your job details: hazards and controls with the residual risk, the standards behind them, PPE, permits and training. You review and edit it before the crew signs, brief them by QR code, and keep the signed record.

Free accounts get 2 plan credits. Pro is $29/month with 20 plan credits a month.

How the builder works

The first page of the builder's sample pre-task plan for anchor-bolt installation at a third-floor deck edge, with the hazards and control measures table
Open the filled-out example

Frequently asked questions

What is a pre-task plan?

The written hazard analysis for one task, done before the work starts: the scope, the hazards, the controls, the risk that remains, and who approved it. It's usually the document the foreman walks the crew through before the shift.

Who fills it out and signs it?

Usually the foreman or the competent person for the task writes it before the shift, and every worker doing the task signs that they were briefed. Your site or contract may name who has to approve it, so check.

Is a pre-task plan the same as a JHA?

It's the same discipline. A Job Hazard Analysis (OSHA's term) and an Activity Hazard Analysis (USACE, EM 385-1-1) break work into steps, hazards and controls. A pre-task plan is that analysis for today's task, with the crew's sign-off attached.

Do I have to use your form?

No. It's free to copy, change and print as often as you like. If your site or GC has its own form, use theirs.